Restoration of the Vengeron stream diversion project

Prina Howald, Erika (School of Management and Engineering Vaud, HES-SO // University of Applied Sciences Western Switzerland) ; Odier, M. (x)

The work cuts across two meanders of the old stream. In the upstream section, adjacent to the crossing of the railway, it runs through a rocky ridge for about 100 m. Then it continues around the bed of the stream and finishes as a platform constructed in embankments in the lake. The cut and cover sector has an internal diameter of 2.50 m. The figure 2 illustrates the method of construction of this structure.


Conference Type:
short paper
Faculty:
Ingénierie et Architecture
School:
HEIG-VD
Institute:
insit - Institut d’ingénierie du territoire
Publisher:
Lausanne, Switzerland, 15-18 June 2010
Date:
2010-06
Lausanne, Switzerland
15-18 June 2010
Pagination:
4 p.
Published in:
Proceedings of Rock mechanics in civil and environmental engineering, Eurock2010 Lausanne, 15-18 June 2010, Lausanne, Switzerland
DOI:
ISBN:
9780429213236
Appears in Collection:



 Record created 2020-03-18, last modified 2020-03-22